Avon, OH

Generator installation coming — 4634 St. Joseph Way

Reviewed Sep 2 · outcome not yet confirmed

Every project links to the city packet it came from.

Michael and Mary McConnell are proposing the installation of a generator and seeking a 1.5 ft. side yard setback variance.

Residential electricalExcavation / gradingFlatwork (sidewalks, curbs, driveways)
What happened
The Avon Board of Zoning and Building Appeals is reviewing a variance request for a generator installation due to a side yard setback requirement.
Why it matters
Approval of the variance would enable the installation of a new residential generator, requiring electrical work, and potentially minor site work for the pad.
Timing
This is a review item; if approved, the homeowners can move forward with the generator installation and necessary permits.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: cityofavon.com

Related projects in Avon