Oak Park Infrastructure design review — Berlin Township
Reviewed Aug 11 · outcome not yet confirmed
Every project links to the city packet it came from.
The Oak Park Final Development Plan for infrastructure is scheduled for design review by the Berlin Township Zoning Commission. This includes site work and utilities to support a residential development.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainagePaving / asphaltErosion & sediment control
- What happened
- The Berlin Township Zoning Commission has scheduled a review for the Oak Park Final Development Plan, specifically concerning infrastructure components (BZC 24-001 & BZC 24-003). This item was continued from a previous meeting on June 23.
- Why it matters
- Review of infrastructure plans indicates upcoming work for site preparation, excavation, and installation of water, sewer, and storm drainage systems, as well as new paving for roads or residential areas. Erosion control, land clearing, and landscaping will also be needed.
- Timing
- This is a design review. If approved, detailed engineering and permitting will follow, typically within 6-12 months for a project of this scope.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: berlintwp.us
