Commercial self-storage facility up for review — Hayden Run Rd
Up for review Oct 22
Every project links to the city packet it came from.
A 3.57-acre personal self-storage complex comprising 5 one-to-two-story buildings and an office has received a recommendation for conditional approval from the Franklin County Planning Commission. The project will feature an underground storm drain network and detention system.
Commercial GCExcavation / gradingErosion & sediment controlFoundations / footingsPaving / asphaltStorm drainage
- What happened
- The Franklin County Planning Commission recommended conditional approval to rezone 3.57 acres from Rural to Select Commercial Planned District for a five-building self-storage complex.
- Why it matters
- New multi-building commercial construction will require substantial sitework, foundation pours, paving, utility installation, and fencing.
- Timing
- The case advances to the Board of County Commissioners for final zoning determination, following which engineered site improvement plans and building permits will be required.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: franklincountyohio.gov
