Storm sewer slip lining project coming — Brunswick
Reviewed Sep 14 · outcome not yet confirmed
Every project links to the city packet it came from.
Brunswick City Council is considering authorizing an agreement with United Survey, Inc. for the 2026 Storm Sewer Slip Lining Project, with a budget not to exceed $179,760.00.
Budget: $180K
Storm drainageExcavation / gradingHauling / truckingTraffic control / flagging
- What happened
- The Brunswick City Council is reviewing an emergency resolution to contract with United Survey, Inc. for a storm sewer slip lining project. This is the first reading of the resolution.
- Why it matters
- This project specifically involves underground storm sewer work, likely trenchless repair methods, and may require excavation for access points, hauling of materials, and traffic control during operations.
- Timing
- As an emergency resolution in its first reading, approval for this project could be expedited, potentially within weeks, allowing the work to commence in 2026 as indicated.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: brunswickoh.api.civicclerk.com
