Canal Winchester, OH

7,200 sq. ft. industrial building up for review — 7830 Robinett Way

Up for review Nov 9

Every project links to the city packet it came from.

Site Development Plan approval is recommended for a new 7,200 sq. ft. office/warehouse building for T.G. Plumbing and Mechanical on a 1.75-acre parcel. The scope includes constructing the metal-sided building with a brick veneer water table, installing underground stormwater retention, adding 50 parking stalls, and setting up loading docks and drive-in doors.

Commercial GCExcavation / gradingStorm drainageFoundations / footingsBrickLandscaping / irrigation
What happened
The Planning and Zoning Commission scheduled a review for Site Development Plan #SDP-26-004 regarding a 7,200 sq. ft. office/warehouse building.
Why it matters
The project requires full commercial buildout trades including sitework, underground stormwater retention, masonry brick, metal building erection, electrical, and plumbing installations.
Timing
The item is on the November 9, 2026 agenda for planning commission review.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester