Box culvert variance granted — 7550 Robinett Way
Reviewed Oct 12 · outcome not yet confirmed
Every project links to the city packet it came from.
The Planning and Zoning Commission granted a variance for Molto Canal Pointe II LLC at 7550 Robinett Way to replace an existing 48-inch storm pipe with a 24-foot by 5-foot box culvert, a key civil improvement for a large industrial site.
Excavation / gradingWater / sewer mainFlatwork (sidewalks, curbs, driveways)Hauling / truckingPaving / asphalt
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
