Public right-of-way up for review — Velocity Hill Road
Reviewed Sep 8 · outcome not yet confirmed
Every project links to the city packet it came from.
City Council adopted an ordinance to accept the dedication of real property from Velocity Hill Road Parcel One, LLC for public right-of-way, paving the way for future public infrastructure development.
Commercial GCExcavation / gradingWater / sewer mainPaving / asphaltFlatwork (sidewalks, curbs, driveways)
- What happened
- City Council adopted an ordinance to accept the dedication of real property from Velocity Hill Road Parcel One, LLC. This property is for public right-of-way.
- Why it matters
- This action enables future public infrastructure development, including road construction, excavation for utilities, and installation of water, sewer, and paving. Concrete flatwork will also be required.
- Timing
- Acceptance of dedication is a preliminary step. Design and funding for public infrastructure typically follow, with construction bidding occurring once plans are finalized, usually within 6-12 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- New 2,000 SF building coming — 8 S. High StSep 30
- Standing seam roof on patio coming — 10 S. High StSep 30
- Window replacement, repainting coming — 1 S. High StSep 30
- 6,553 SF Sun Auto Tire & Service up for review — Diley Rd/Meijer DrSep 30
- Redesigned 2-tenant building up for review — in front of MeijerSep 30
