Canal Winchester, OH

Storm pipe replaced with box culvert — 7750 Robinett Way

Up for review Oct 12

Every project links to the city packet it came from.

A variance is requested to replace an existing 48-inch storm pipe with a new 24-foot by 5-foot box culvert at 7750 Robinett Way. This is part of the site development for a new 210,748 sq. ft. speculative industrial building, addressing an undersized existing pipe and improving storm water handling.

Storm drainageExcavation / gradingPrecast / prestressedHauling / truckingStructural / formed concrete
What happened
The Planning and Zoning Commission is scheduled to review a variance request to allow replacement of an existing storm pipe with a new box culvert at 7750 Robinett Way. This is for a previously approved 210,748 sq. ft. industrial building.
Why it matters
The project requires significant excavation for culvert installation and likely precast or formed concrete work for the new box culvert, plus earthwork for grading and backfill.
Timing
The variance is on the agenda for review on October 12, 2026. If approved, detailed engineering and construction for the culvert replacement would follow.

Who to call

No contractor selected yet — the applicant/owner is the contact.