A variance is requested to replace an existing 48-inch storm pipe with a new 24-foot by 5-foot box culvert at 7750 Robinett Way. This is part of the site development for a new 210,748 sq. ft. speculative industrial building, addressing an undersized existing pipe and improving storm water handling.
Storm drainageExcavation / gradingPrecast / prestressedHauling / truckingStructural / formed concrete
- What happened
- The Planning and Zoning Commission is scheduled to review a variance request to allow replacement of an existing storm pipe with a new box culvert at 7750 Robinett Way. This is for a previously approved 210,748 sq. ft. industrial building.
- Why it matters
- The project requires significant excavation for culvert installation and likely precast or formed concrete work for the new box culvert, plus earthwork for grading and backfill.
- Timing
- The variance is on the agenda for review on October 12, 2026. If approved, detailed engineering and construction for the culvert replacement would follow.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- Retail tenant improvements coming — Waterloo Crossing SCSep 21
- 271-lot residential development — 5593 Hayes RdSep 21
- Lock Pointe Village clubhouse redesign — 6700 Nathan DriveOct 12
- 100 sq. ft. shed up for review — 9571 Busey RoadSep 14
- Privacy fence and site improvements up for review — 6270 Bowen RoadSep 14