Canal Winchester, OH

Washington St. 12-inch waterline replacement — Walnut Creek to the curves

Reviewed Oct 1 · outcome not yet confirmed

Every project links to the city packet it came from.

The Utilities Department is reviewing the final design for a project to replace the existing 12-inch waterline along Washington Street, extending from the bridge over Walnut Creek to the curves.

Water / sewer mainExcavation / gradingFlatwork (sidewalks, curbs, driveways)Paving / asphaltTraffic control / flagging
What happened
The Utilities Department is reviewing the final design for a project to replace a 12-inch waterline on Washington Street.
Why it matters
This project is a direct opportunity for underground utility contractors specializing in water main replacement and associated excavation. It will also require restoration of disturbed surfaces like paving and potentially traffic control.
Timing
Final design review is underway, indicating that the project is moving closer to bidding.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester