Construction projects approved in Canal Winchester, OH

Updated August 17, 2026

Every project links to the city packet it came from.

34 projects in the last 30 days: Excavation / grading, Commercial GC, Paving / asphalt. 106 on record.

Residential driveway up for review — 213 N Sarwil Dr

Canal Winchester, OH

Reviewed Jun 8 · outcome not yet confirmed

A variance was approved for a new residential driveway at 213 N Sarwil Drive to permit it to be wider than 10 feet at the right-of-way line. The driveway has al…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltFlatwork (sidewalks, curbs, driveways)

Cat rescue facility coming — 229 Winchester Cem. Rd

Canal Winchester, OH

Reviewed Jul 13 · outcome not yet confirmed

Conditional Use approval is sought to permit a commercial kennel for a cat rescue at 229 Winchester Cemetery Road.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCJanitorial / post-construction cleanup

Right-of-way dedication up for review — Lock Pointe Village

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

An ordinance to accept the dedication of real property from Lock Pointe Village, LLC for public right-of-way use was moved to full Council for adoption. This al…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltExcavation / grading

Single-family development up for review — Miller Farms Subarea A

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

A revised final development plan for Subarea A of Miller Farms single-family development was approved, reducing the number of lots from 118 to 106 to accommodat…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalFencing

Paving starting — multiple streets Canal Winchester

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

After Dietz Drive is near completion, the paving crew will mill off the surface of other streets and move directly into paving them. Most contract work for the …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltExcavation / gradingPower washing / pressure cleaning

Streetscape & crosswalks underway — High & Columbus

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

Contractors are currently working at High and Columbus downtown to complete bump outs and crosswalk replacements. This work will take a couple of weeks to finis…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltFlatwork (sidewalks, curbs, driveways)Excavation / gradingPower washing / pressure cleaning

Street program underway — Canal Winchester

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

The street program is active, with miscellaneous curb repairs completed and restoration work beginning this week. The sidewalk program is also active, with pane…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltFlatwork (sidewalks, curbs, driveways)Excavation / gradingPower washing / pressure cleaning

Utilities starting — McGill Park

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

Work at McGill Park is underway, with significant dirt moving. Storm sewer and sanitary sewer installation are scheduled to begin next week.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Water / sewer mainExcavation / grading

Paving & striping underway — Winchester Boulevard

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

Paving of Winchester Boulevard is underway, with milling occurring Tuesday night and paving on Wednesday night. Permanent striping and signage installation will…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltStripingTraffic control / flagging

New signage coming — Canal Winchester Pool

Canal Winchester, OH

Reviewed Jun 1 · outcome not yet confirmed

Signs are being made for the Canal Winchester Pool area, including a sandwich board and yard signs, to help guide patrons through the new entry process and day …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Signage

CRA agreement proposed for new structure — Molto Canal Pointe II

Canal Winchester, OH

Reviewed Jun 15 · outcome not yet confirmed

Canal Winchester City Council adopted a Community Reinvestment Area agreement with Molto Canal Pointe II, L.L.C., for a new structure or structures. The agreeme…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Property dedication accepted — Lock Pointe Village LLC

Canal Winchester, OH

Reviewed Jun 15 · outcome not yet confirmed

Canal Winchester City Council is accepting the dedication of a 0.206-acre parcel of land from Lock Pointe Village, LLC for use as public right-of-way on the eas…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)Landscaping / irrigationPaving / asphalt

200k SF industrial building started — Hill Road

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

Browning has broken ground on their 'Velocity' project, a 200,200 square-foot industrial building. Construction activity is visible behind the Meijer on Hill Ro…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

New River Electric site improvements — Canal Winchester

Canal Winchester, OH

Reviewed Jun 15 · outcome not yet confirmed

New River Electric is finalizing plans to restripe and reorient parking, and install fencing for outdoor storage screening at their site. They may pursue a vari…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFencingStripingExcavation / grading

Retail strip center back on track — in front of Meijer

Canal Winchester, OH

Reviewed Jun 15 · outcome not yet confirmed

The previously approved strip center project in front of Meijer is back on track due to new tenant interest. Construction documents are under review, with groun…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalCommercial HVAC

Molto industrial project starting — Robinette Way

Canal Winchester, OH

Reviewed Jun 15 · outcome not yet confirmed

Molto is planning to break ground on their industrial project before the end of the month. Construction activity will begin soon, though no event is planned.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Excavation / gradingHauling / trucking

US Route 33 widening up for review — Canal Winchester

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

The City Council authorized the Mayor to enter into contracts with the Ohio Director of Transportation for the widening of US Route 33. This project will expand…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltFlatwork (sidewalks, curbs, driveways)StripingExcavation / grading

Roof replacement — 36 South High Street

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

An appropriation amendment includes $60,000 for the replacement of the roof at 36 South High Street due to leaks and previous inadequate repairs. This is an urg…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

RoofingJanitorial / post-construction cleanup

Water line easement — Meijer Stores LP

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

A resolution is being considered to allow the Mayor to accept a water line easement from Meijer Stores Limited Partnership. This suggests potential or ongoing u…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Water / sewer main

Technology upgrades — Water plant IT closet

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

An appropriation amendment includes $20,000 for technology replacements and upgrades in the IT closet at the water plant. This will involve infrastructure impro…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Low-voltage / data / security / AVCommercial / industrial electrical

276-home rezoning coming — Miller Farms

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

The Estates at Miller Farms applied for rezoning of 111 acres to the west of the existing Miller Farms, for approximately 246-276 single-family homes. A public …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingLandscaping / irrigationPaving / asphaltWater / sewer main

210k SF industrial building started — Robinette Way

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

Molto Properties has broken ground on a new 210,000 square-foot industrial building at the dead end of Robinette Way. Construction activity is visible from Robi…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Hill Rd Widening Project funding pursued

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

An ordinance is under second reading to authorize seeking financial assistance from the Ohio Public Works Commission for the Hill Rd. Widening Project.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltLandscaping / irrigationStripingExcavation / grading

Earth moving starting — Bixby Rd & U.S. 33

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

Opus has closed on the Schacht property at Bixby Road and U.S. 33, with equipment expected to be on site this week for extensive earth moving.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingHauling / trucking

Single-family home development started — Miller Farms

Canal Winchester, OH

Reviewed Jul 20 · outcome not yet confirmed

Rockford Homes has closed on the single-family portion of Miller Farms and is moving forward with development. Wilcox is still working on final plan approvals f…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Landscaping / irrigationPaving / asphalt

Lithopolis-Winchester Rd paving coming — Lithopolis-Winchester Rd

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

An agreement has been finalized with Fairfield County Engineer and the Village of Lithopolis to partner on a project to pave the entire length of Lithopolis-Win…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Paving / asphaltStripingExcavation / gradingTraffic control / flagging

210,000 sq ft industrial building under construction — Robinett Way

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Molto Properties has begun construction on a 210,000-square-foot speculative industrial building on Robinett Way in the Canal Point Industry & Commerce Park, wi…

Who controls the list now: GC named — the winning contractor is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Three industrial buildings coming — Bixby Rd

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Opus has completed the purchase of the Schacht property on Bixby Road, and all permits have been issued for the construction of three speculative industrial bui…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Lock Pointe Village mass grading underway — Canal Winchester

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Mass grading is currently underway for the Lock Pointe Village development.

Who controls the list now: GC named — the winning contractor is the contact.

Excavation / gradingPaving / asphaltWater / sewer main

CW High School mass grading complete — Canal Winchester High School

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Mass grading has been performed and utility taps have been made for the new Canal Winchester High School project.

Who controls the list now: GC named — the winning contractor is the contact.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)FencingLandscaping / irrigation

Kroger Diley Rd parking lot building — Diley Rd

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

A parking lot is under construction at the Kroger on Diley Road, with utilities already complete.

Who controls the list now: GC named — the winning contractor is the contact.

Paving / asphaltFlatwork (sidewalks, curbs, driveways)SignageStriping

McGill Park Phase 2B site work progressing — Canal Winchester

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Tucson Inc. is under contract for McGill Park Phase 2B, with parking lot and shelter construction underway. Stream restoration is scheduled to begin on August 1…

Who controls the list now: GC named — the winning contractor is the contact.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)Commercial GCLandscaping / irrigation

WRF Headworks Replacement forming foundation — Canal Winchester

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Kokosing Industrial is continuing to form and pour foundation walls for the Water Reclamation Facility (WRF) Headworks Replacement project.

Who controls the list now: GC named — the winning contractor is the contact.

Flatwork (sidewalks, curbs, driveways)Commercial GCExcavation / gradingWater / sewer main

Ashbrook Village drainage work coming — Canal Winchester

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

The city is finalizing the contract and easements for drainage repair work in Ashbrook Village. Work is not expected to start until later in the summer, pending…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingLandscaping / irrigationWater / sewer main

Screened porch added coming — 7188 Charleton Court Canal Winchester OH 43110

Canal Winchester, OH

Reviewed Jul 23 · outcome not yet confirmed

Terrence and Megan Bell are appealing the denial of a variance request to construct a screened porch addition at their residence at 7188 Charleton Court. The va…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCCommercial / industrial electricalRoofingPainting / coatings

Miller Farms single-family site work coming — Hayes Rd & Oregon Rd

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Rockford Homes has closed on the single-family portion of Miller Farms and intends to begin site work and infrastructure construction in the fall, with home con…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)FencingLandscaping / irrigation

Sun Auto and Tire up for review — Diley Rd and Meijer

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

The Sun Auto and Tire project has been approved for the corner of Diley Road and Meijer.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

New Dunkin' Donuts up for review — Winchester Pike

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

A standalone Dunkin' Donuts is planned for construction across the street from the Waffle House on Winchester Pike.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

New Dunkin' Donuts up for review — Walmart facility

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

A Dunkin' Donuts will be added inside the Walmart facility, located on the left side of the westernmost entrance, next to the existing Subway.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Earthwork started — Molto Properties Robinett Way

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Molto Properties has begun earthwork on their project located at the dead end of Robinett Way in Canal Pointe.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingHauling / truckingPower washing / pressure cleaning

Earthwork started — Schacht property Bixby Rd

Canal Winchester, OH

Reviewed Aug 3 · outcome not yet confirmed

Opus has completed the purchase of the Schacht property on Bixby Road, and earthwork has commenced. All necessary permits have been issued for the project.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingHauling / truckingPower washing / pressure cleaning

Retail building redesign coming — Diley Rd and Meijer

Canal Winchester, OH

Reviewed Aug 17 · outcome not yet confirmed

A multi-tenant building project at Diley Road and Meijer, previously stalled, is now back on the docket with the same developer but redesigned as a two-tenant b…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCCommercial / industrial electricalFire sprinklerCommercial HVAC

New food hall coming — Hartman's Building

Canal Winchester, OH

Reviewed Aug 17 · outcome not yet confirmed

An application for a Community Entertainment District liquor permit (D-5J) was submitted for the existing Hartman's building, indicating potential development o…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCCommercial / industrial electricalFire sprinklerCommercial HVAC

Hill Road drainage issue fix coming — Ashbrook Village

Canal Winchester, OH

Reviewed Aug 17 · outcome not yet confirmed

Canal Winchester is finalizing contracts and easements to address drainage issues in Ashbrook Village, with work expected to begin later in the summer.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)Landscaping / irrigationHauling / trucking

New wall sign up for review — 80 West Waterloo Street

Canal Winchester, OH

Reviewed Jun 22 · outcome not yet confirmed

Approval for a new 24-inch diameter aluminum wall sign with the Carmen Orthodontics logo to be installed on the front portico gable. The decorative vinyl appliq…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

SignagePainting / coatings

New asphalt shingles up for review — 100 West Columbus Street

Canal Winchester, OH

Reviewed Jul 27 · outcome not yet confirmed

Approval was granted to install new CertainTeed Landmark shingles in 'Moire Black' on a single-family home and detached outbuilding, replacing existing 3-tab sh…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

RoofingPower washing / pressure cleaning

New hanging sign up for review — 60 East Waterloo St, Suite B

Canal Winchester, OH

Reviewed Mar 23 · outcome not yet confirmed

The Landmarks Commission approved the installation of a new 22” x 31” hanging sign for Suite B at 60 East Waterloo Street. The sign will be aluminum with vinyl …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Signage

Front porch and roof modifications up for review — 44 West Mount Street

Canal Winchester, OH

Reviewed Apr 27 · outcome not yet confirmed

Certificate of Appropriateness #CA-26-007 was approved to modify a front porch design to be fully enclosed and change the roof materials to a striated standing …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCRoofingPainting / coatings

Half-round gutters up for review — 121 East Waterloo Street

Canal Winchester, OH

Reviewed Mar 23 · outcome not yet confirmed

The Landmarks Commission approved the installation of seamless half-round gutters on the front porch of 121 East Waterloo Street, with the condition that they b…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GC

Knee braces & garage addition up for review — 56 West Columbus Street

Canal Winchester, OH

Reviewed May 26 · outcome not yet confirmed

The Landmarks Commission approved adding corbels (knee braces) to the home's gables and dormer, and constructing a 4'x7' lean-to addition to the garage at 56 We…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCPainting / coatings