Cincinnati, OH

Asphalt expansion for vehicle storage planned — 251 Northland Blvd

Reviewed Sep 8 · outcome not yet confirmed

Every project links to the city packet it came from.

Highlift Offroad is requesting approval for a minor development plan to expand its existing asphalt pavement for additional paved and secure outdoor storage of Jeep vehicles. The project involves site regrading, an increase in impervious area by 11,115 SF, and installation of a StormTech detention system.

Erosion & sediment controlFlatwork (sidewalks, curbs, driveways)Storm drainageCommercial GCFencingLandscaping / irrigation
What happened
The Planning Commission is reviewing a minor development plan for a 11,115 square foot asphalt pavement expansion at Highlift Offroad. This is a continuation from a previous meeting, pending resolution of multiple variances with the Board of Zoning Appeals.
Why it matters
The project requires significant sitework including excavation, grading, erosion control, and asphalt paving for the new storage area. Underground storm drain work, including a StormTech detention system, is also a core part of the scope. Fencing will be needed around the storage area.
Timing
The Planning Commission has not yet approved the plan, recommending a continuance until zoning variances are approved. Once variances are secured and the plan is approved, construction plans and permits would follow. The project is currently in early design review.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: springdaleohio.gov

Related projects in Cincinnati