Cincinnati, OH

Pedestrian safety and traffic calming up for review — University of Cincinnati Area

Reviewed Oct 7 · outcome not yet confirmed

Every project links to the city packet it came from.

City Council introduced an emergency ordinance to accept and appropriate $23,240.20 in additional Highway Safety Improvement Program grant funds from ODOT into capital project account no. 980x232x252365 for the UC Area Pedestrian Safety Grant (PID 121859) to implement pedestrian safety and street calming measures around the University of Cincinnati campus.

Budget: $23K

Flatwork (sidewalks, curbs, driveways)SignageTraffic control / flagging
What happened
Council moved to accept additional grant funding for the UC Area Pedestrian Safety Grant to construct traffic calming and pedestrian improvements.
Why it matters
Installation of traffic calming measures requires flatwork, paving, striping, and signage contractors.
Timing
Grant funds are being appropriated by council; construction contracting follows administrative scheduling.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: cincinnatioh.legistar.com

Related projects in Cincinnati