Covered patio construction up for review — 9115 Fernhill Ave
Reviewed Oct 5 · outcome not yet confirmed
Every project links to the city packet it came from.
Variance was granted to construct a 10' 6" x 19' 6" roof over an existing front patio totaling 205 square feet.
Rough framingRoofingFlatwork (sidewalks, curbs, driveways)
- What happened
- City council approved a variance for Karkoff Construction to build a 205 square-foot covered patio roof at 9115 Fernhill Ave.
- Why it matters
- Rough carpentry and roofing trades will be needed to frame and cover the new patio structure.
- Timing
- Permitting and construction can be initiated following the variance approval.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: cityofparma-oh.gov
Related projects in Cleveland
- High school adaptive reuse up for review — 6735 Amed RdOct 5
- Commercial wall signage up for review — 7229 W. Ridgewood DrOct 5
- Roadway resurfacing coming — Stokes Blvd from MLK Jr Dr to Chester AveOct 21
- Target speed pilot project improvements coming — St. Clair AveOct 21
- Roadway resurfacing coming — Wade Park Ave from E 66th to E 118th StOct 21
