Cleveland, OH

New construction Gateway 55 coming — 2966 E 55th St

Reviewed Oct 2 · outcome not yet confirmed

Every project links to the city packet it came from.

The Southeast Design Review is reviewing schematic plans for new construction for the 'Gateway 55 Project' at 2966 E 55th St. This is a new construction project in the Broadway-Slavic Village area.

Commercial GCFoundations / footingsRough framingRoofingExcavation / gradingWater / sewer main
What happened
Schematic approval for the Gateway 55 new construction project at 2966 E 55th St is on the agenda for Southeast Design Review. This is an early stage for a new building.
Why it matters
New construction means opportunities for general contractors, sitework, concrete, framing, and all building envelope and interior trades. Mechanical, electrical, and plumbing trades will also be required.
Timing
Approval of schematic plans will be followed by further design development, construction drawings, and eventually permitting, typically within 6-12 months.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: clevelandohio.gov

Related projects in Cleveland