Railroad bridge replacement coming — Superior Ave
Reviewed Jul 24 · outcome not yet confirmed
Every project links to the city packet it came from.
Ordinance 770-2026 gives consent to Norfolk Southern Corporation to replace the Superior Avenue Railroad Bridge and railroad track, including replacing and repositioning support columns.
Excavation / gradingStructural / formed concreteSteel erectionCrane & riggingTraffic control / flaggingTemporary fencing
- What happened
- An ordinance was introduced to grant consent to Norfolk Southern Corporation for the replacement of the Superior Avenue Railroad Bridge and associated track and support columns.
- Why it matters
- This project involves significant heavy civil construction including demolition, earthwork, structural concrete, and steel erection for a new bridge and track. It implies major infrastructure work.
- Timing
- The ordinance has been introduced and was previously approved by CPC. With city consent, Norfolk Southern can move forward with planning, design, and procurement for the bridge replacement project, likely in the next 6-12 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: clevelandohio.gov
Related projects in Cleveland
- Water mains renewal & repair coming — various Cleveland streetsOct 5
- Baggage system upgrade coming — Cleveland Hopkins AirportOct 5
- Wireless telecom tower scheduled — 3182 E 82nd StJul 10
- New residential construction — W 61st Homes at Home CommonsJul 10
- Demolition project reviewed — 6313 St Clair AveAug 7
