Cleveland, OH

Shaker Boulevard resurfacing up for review — Shaker Blvd

Up for review Oct 16

Every project links to the city packet it came from.

Legislation introduced giving consent to the Ohio Department of Transportation to resurface Shaker Boulevard from Buckeye Road to the east corporation line.

Paving / asphaltStripingTraffic control / flagging
What happened
Ordinance 1240-2026 was introduced to authorize city consent and financial participation for ODOT's resurfacing of Shaker Boulevard.
Why it matters
Roadway resurfacing requires asphalt paving, striping, and traffic control contractor services.
Timing
Introduced on the October 16, 2026 agenda.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: clevelandohio.gov

Related projects in Cleveland