The St Maron Parking Lot Project at 1245 Carnegie (also 1212 & 1260 Sumner Ave) is scheduled for final design review. This project involves the creation of a new surface parking lot.
Paving / asphaltExcavation / gradingFlatwork (sidewalks, curbs, driveways)StripingFencingStorm drainage
- What happened
- The Downtown/Flats Design Review committee is conducting a final review for the St Maron Parking Lot Project at 1245 Carnegie (1212 & 1260 Sumner Ave). This is for a new surface parking lot.
- Why it matters
- Final design review for a surface parking lot means grading, paving, striping, drainage, and potentially fencing and lighting will be needed. This work is imminent after approval.
- Timing
- Final design review is a late-stage approval. Construction of the parking lot could commence relatively soon after approval.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: clevelandohio.gov
Related projects in Cleveland
- Cemetery facilities improvements funded — ClevelandSep 28
- New industrial construction conceptual review — 0 Rocky River DriveMar 6
- New construction final review — Capitol Avenue & E89th StreetMar 6
- New residential construction final review — W 30th Street & Seymour AveMar 6
- Demolition final review — 8021 Rawlings AveMar 6