Commercial and residential mixed-use development approved — 247 E Livingston Ave
Approved Sep 2 · confirmed in minutes
Every project links to the city packet it came from.
The German Village Commission approved a conceptual mixed-use development involving the demolition of an existing two-story brick structure, retention and modification of a two-story Italianate brick structure, and construction of a new mixed-use building along East Livingston Avenue combined with row housing facing E Blenkner Street, featuring 52 total dwelling units.
Commercial GCDemolitionBrickStone veneerRough framingExcavation / grading
- What happened
- The German Village Commission approved the conceptual design and demolition for a 52-unit mixed-use and row housing project at 247 E Livingston Ave.
- Why it matters
- Demolition of the existing structure and subsequent new construction will require extensive sitework, structural masonry, and framing trades.
- Timing
- The applicant must submit detailed construction drawings, materials, and site plans per City Code 3116.07C for review at a future hearing before permits or demolition can proceed.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: columbus.gov
