Columbus, OH

Commercial and residential mixed-use development approved — 247 E Livingston Ave

Approved Sep 2 · confirmed in minutes

Every project links to the city packet it came from.

The German Village Commission approved a conceptual mixed-use development involving the demolition of an existing two-story brick structure, retention and modification of a two-story Italianate brick structure, and construction of a new mixed-use building along East Livingston Avenue combined with row housing facing E Blenkner Street, featuring 52 total dwelling units.

Commercial GCDemolitionBrickStone veneerRough framingExcavation / grading
What happened
The German Village Commission approved the conceptual design and demolition for a 52-unit mixed-use and row housing project at 247 E Livingston Ave.
Why it matters
Demolition of the existing structure and subsequent new construction will require extensive sitework, structural masonry, and framing trades.
Timing
The applicant must submit detailed construction drawings, materials, and site plans per City Code 3116.07C for review at a future hearing before permits or demolition can proceed.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: columbus.gov

Related projects in Columbus