Columbus, OH

Youth development & cultural center approved — 3740 Walker Rd

Approved Jun 9 · confirmed in minutes

Every project links to the city packet it came from.

A youth development and cultural community center project, including three buildings, recreational fields, and a stormwater pond, was recommended for approval. The development will be served by well and septic systems.

Commercial GCExcavation / gradingWater / sewer mainLand clearing / tree serviceFoundations / footingsLandscaping / irrigation
What happened
The Big Darby Accord Advisory Panel recommended approval of a rezoning application for 23.894 acres at 3740 Walker Road to permit a youth development and cultural community center. The project includes three buildings (two dwelling units for staff), three recreational fields, a stormwater pond, well, and septic systems.
Why it matters
This approval moves the project forward, indicating future construction for site preparation, foundations, utility installation (well, septic, stormwater), and vertical building construction. Landscaping will also be a significant scope item due to specific conditions.
Timing
This is a rezoning approval. Site development and construction plans will follow, with a three-year timeframe from rezoning approval to zoning compliance and construction. Bid documents for various trades would typically be prepared during this period.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: columbus.gov

Related projects in Columbus