Youth development & cultural center approved — 3740 Walker Rd
Approved Jun 9 · confirmed in minutes
Every project links to the city packet it came from.
A youth development and cultural community center project, including three buildings, recreational fields, and a stormwater pond, was recommended for approval. The development will be served by well and septic systems.
Commercial GCExcavation / gradingWater / sewer mainLand clearing / tree serviceFoundations / footingsLandscaping / irrigation
- What happened
- The Big Darby Accord Advisory Panel recommended approval of a rezoning application for 23.894 acres at 3740 Walker Road to permit a youth development and cultural community center. The project includes three buildings (two dwelling units for staff), three recreational fields, a stormwater pond, well, and septic systems.
- Why it matters
- This approval moves the project forward, indicating future construction for site preparation, foundations, utility installation (well, septic, stormwater), and vertical building construction. Landscaping will also be a significant scope item due to specific conditions.
- Timing
- This is a rezoning approval. Site development and construction plans will follow, with a three-year timeframe from rezoning approval to zoning compliance and construction. Bid documents for various trades would typically be prepared during this period.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: columbus.gov
Related projects in Columbus
- Exterior building alterations continued — 1501 Michigan AveJul 23
- New construction with demolition approved — 190 King AveJun 25
- New construction conceptual review — 21 E. Arcadia AveJun 25
- Demolition and new construction conceptual — 2060 N. High StJun 25
- Demolition, change in use, exterior modification — 610 W. Town StJul 22
