3-lot residential CAD subdivision up for review — Concord
Reviewed Oct 29 · outcome not yet confirmed
Every project links to the city packet it came from.
Preliminary approval was recommended for Evergreen CAD, a 3-lot common access driveway single-family residential subdivision spanning 10.39 acres.
Home builder / residential GCExcavation / gradingLand clearing / tree serviceErosion & sediment controlPaving / asphaltStorm drainage
- What happened
- Preliminary approval was granted for the Evergreen CAD 3-lot subdivision utilizing a widened common access driveway in Concord Township.
- Why it matters
- Preliminary approval advances the project toward final platting, requiring driveway widening, wetland crossing construction, and residential construction.
- Timing
- Final engineering review and wetland crossing approvals precede final plat recording.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
Unlock