Cuyahoga Falls, OH

20 MW solar array EPC contractor replacement up for review — Hardy Road

Up for review Oct 26

Every project links to the city packet it came from.

An ordinance was introduced authorizing Advanced Solar Products, Inc. to replace CS Energy as the engineering, procurement, and construction partner for the 20 MW AC solar array at the Hardy Road Landfill.

Solar / EV chargingCommercial GCCommercial / industrial electrical
What happened
Temp. Ord. A-91 was introduced to approve Advanced Solar Products, Inc. as the new EPC contractor taking over the 20 MW solar array project from CS Energy.
Why it matters
The incoming EPC contractor will oversee the completion and bonding requirements for the utility-scale solar installation.
Timing
The ordinance requires council approval to formally substitute the EPC partner and execute performance and payment bonds.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: cityofcf.com

Related projects in Cuyahoga Falls