An ordinance was introduced authorizing Advanced Solar Products, Inc. to replace CS Energy as the engineering, procurement, and construction partner for the 20 MW AC solar array at the Hardy Road Landfill.
Solar / EV chargingCommercial GCCommercial / industrial electrical
- What happened
- Temp. Ord. A-91 was introduced to approve Advanced Solar Products, Inc. as the new EPC contractor taking over the 20 MW solar array project from CS Energy.
- Why it matters
- The incoming EPC contractor will oversee the completion and bonding requirements for the utility-scale solar installation.
- Timing
- The ordinance requires council approval to formally substitute the EPC partner and execute performance and payment bonds.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: cityofcf.com
Related projects in Cuyahoga Falls
- Clean Express car wash facility coming — 581 Howe AvenueOct 26
- Raise street light poles along State Route 8 up for review — Cuyahoga FallsOct 26
- Hudson Drive road resurfacing approved — Front St to Graham RdSep 28
- Fire hydrant replacements awarded — Bath RoadSep 28
- Spirol Shims facility addition approved — 321 Remington RdSep 28