Hudson Drive repair/resurfacing scheduled — Front St to Graham Rd
Reviewed Sep 14 · outcome not yet confirmed
Every project links to the city packet it came from.
An ordinance is scheduled for review authorizing the Director of Public Service to contract for the repair and resurfacing of Hudson Drive from Front Street to Graham Road.
Paving / asphaltExcavation / gradingHauling / truckingFlatwork (sidewalks, curbs, driveways)StripingTraffic control / flagging
- What happened
- Cuyahoga Falls City Council has an ordinance on its agenda to authorize the Director of Public Service to enter into contracts for the repair and resurfacing of Hudson Drive between Front Street and Graham Road.
- Why it matters
- This project involves significant asphalt paving work, potentially including excavation and subgrade preparation, as well as concrete flatwork for curbs/sidewalks and traffic control.
- Timing
- This item is on the council agenda for review. If authorized, bid documents would typically follow for competitive bidding, unless another method is specified.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: cityofcf.com
