Annual stormwater management basin maintenance awarded — Dublin
GC named Sep 28 · sub buyout window
Every project links to the city packet it came from.
City Council accepted the lowest and best bid for the Annual Stormwater Management Basin Maintenance Program 2026 Project (25-024-CIP), covering improvements to a dry detention basin in the Riverside Woods neighborhood and a basin at 4410 Mayapple Court, including regrading, storm sewer installation, and outlet control structure construction.
Budget: $500K
Excavation / gradingStorm drainageErosion & sediment controlLandscaping / irrigation
- What happened
- City Council accepted the bid from B Theory Construction Group Limited for stormwater basin maintenance and improvements.
- Why it matters
- Scope includes extensive excavation with off-site hauling, storm sewer installation, rock placement with underdrain, and specialized outlet structures.
- Timing
- Contract award is completed; construction activity follows immediately.
Who to call
GC named — the winning contractor is the contact.
Named contact in the filing — locked
UnlockSource: dublinohiousa.gov
Related projects in Dublin
- Annual storm structure maintenance project awarded — DublinSep 28
- Multi-tenant building up for review — 6285 Sawmill Road (6285)Oct 1
- Vista Community Church – Pickleball CourtsOct 15
- SportsOhio parking lot resurfacing contract proposed award — DublinOct 26
- SportsOhio parking lot resurfacing proposed award — DublinOct 26
