Dublin, OH

Perimeter security concept approved — Riverside Crossing Park

Approved Jun 8 · confirmed in minutes

Every project links to the city packet it came from.

Dublin City Council approved a concept for integrated perimeter security improvements at Riverside Crossing Park on the east side, specifically along Riverside Drive. The plan includes extending vehicle-deterrent infrastructure like trees, boulders, benches, and landscape elements, along with a steel-backed timber system and an additional interior pedestrian walkway.

Budget: $2.0M

Flatwork (sidewalks, curbs, driveways)Landscaping / irrigationMisc / ornamental metalsExcavation / gradingHauling / truckingTraffic control / flagging
What happened
Dublin City Council approved the design concept plan for integrated perimeter security improvements at Riverside Crossing Park, presented by Mr. Earman.
Why it matters
This project involves significant civil and landscape work, including installation of vehicle deterrents (boulders, benches, steel-backed timber system) and a new pedestrian walkway, requiring excavation, concrete flatwork, and landscaping trades. Traffic control will be needed during construction.
Timing
The design concept is approved; staff will bring the final design concept to Council before proceeding to bid. This typically occurs within 3-6 months for projects of this scope.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: dublinohiousa.gov

Related projects in Dublin