Storm structure maintenance bid acceptance coming — Dublin
Up for review Sep 28
Every project links to the city packet it came from.
A resolution is being considered to accept the lowest and best bid for the Annual Storm Structure Maintenance Program 2026 Project (26-019-CIP). This indicates a contract will soon be awarded for maintenance work on storm structures.
Storm drainageFlatwork (sidewalks, curbs, driveways)Excavation / gradingPaving / asphalt
- What happened
- Dublin City Council is set to review a resolution to accept the lowest and best bid for the Annual Storm Structure Maintenance Program 2026 Project.
- Why it matters
- Acceptance of a bid means a contract will be awarded for storm structure maintenance, which involves work on underground storm drainage systems, potentially requiring excavation and concrete flatwork for repairs.
- Timing
- Council will vote on accepting the bid. Following approval, a contract will be awarded, and work would commence for the 2026 program.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: dublinohiousa.gov
