Roadway realignment and repaving coming — North Walnut St
Reviewed Oct 26 · outcome not yet confirmed
Every project links to the city packet it came from.
Resolution No. 2026-30 authorizes an application to the Ohio Public Works Commission to fund the realignment of the intersection of North Walnut and Harrison, repaving North Walnut Street between Church and Harrison, and replacing sidewalks.
Flatwork (sidewalks, curbs, driveways)Excavation / gradingStripingSignageStorm drainage
- What happened
- Council introduced a resolution authorizing an OPWC grant application for intersection realignment, repaving on North Walnut Street, and sidewalk replacement.
- Why it matters
- Grant funding pursuit initiates civil infrastructure work including road repaving, concrete flatwork for sidewalks, and possible intersection grading.
- Timing
- If grant funding is secured through the OPWC program, engineering design and public bidding will follow in subsequent quarters.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: galenaohio.gov
