Groveport, OH

Fire station construction GMP approved — Madison Twp

Approved Mar 2 · confirmed in minutes

Every project links to the city packet it came from.

Madison Township Trustees approved committee recommended alternates to the Guaranteed Maximum Price (GMP) for the construction of a new 11,000 square foot, 2-bay fire station (Station 183). Turner Construction was authorized to finalize necessary documents, and KZF Architects is also involved in the design-build project.

Budget: $3.5M

Commercial GCExcavation / gradingFoundations / footingsSteel erectionRough framingFlatwork (sidewalks, curbs, driveways)
What happened
Madison Township Trustees approved recommended alternatives to the GMP for the new Station 183 fire station and authorized Turner Construction to finalize documents. The GMP is $3,500,000 for an 11,000 sq ft, 2-bay station, selected as a design-build project with Turner Construction and KZF Architects.
Why it matters
This approval means the project design is moving forward, allowing Turner Construction to prepare bid documents for various subcontractors. Core trades will be needed for the building structure, envelope, and MEP systems, while adjacent trades will cover site improvements, interior finishes, and landscaping.
Timing
With the GMP and alternates approved, the next step is for building documents to be completed and bid out to subcontractors. This typically occurs within the next few months after such an approval.

Who to call

No contractor selected yet — the applicant/owner is the contact.