Hilliard, OH

Mando Ditch drainage and tile installation approved — Brown Twp

Approved Jun 15 · confirmed in minutes

Every project links to the city packet it came from.

The Brown Township Board of Trustees elected a direct assessment method for the Mando Ditch drainage improvement project, which includes cleaning, constructing, installing tile, relocating, and altering the drainage system along Morris Road and Jerman Lane rights-of-way.

Budget: $659K

Excavation / gradingStorm drainageErosion & sediment controlLand clearing / tree serviceHauling / trucking
What happened
The Brown Township Board of Trustees adopted a resolution electing a direct assessment of $658,720.00 for drainage and tiling improvements associated with the Mando Ditch project affecting township rights-of-way.
Why it matters
The drainage and tile installation work requires excavation, trenching, storm utility construction, and earthmoving along the project corridor.
Timing
With the funding and assessment method approved by the township, engineering finalization and public bidding or county-administered construction scheduling will follow.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: browntwp.org

Related projects in Hilliard