Hilliard, OH

Residential subdivision plat up for review — Hill Farm II West Section 1

Reviewed Aug 24 · outcome not yet confirmed

Every project links to the city packet it came from.

City Council accepted the dedication of roads (Percheron Drive, Tovero Loop East, Tovero Loop West) and easements for public and private utilities, cable television, service connections, and storm water drainage for Section 1 of the Hill Farm II West Development. This plat covers 35 single-family lots and two reserves on 12.862 acres.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingCommercial HVACPainting / coatings
What happened
City Council approved the final plat for Hill Farm II West, Section 1, accepting the dedication of new public roads and easements for utilities and stormwater. This enables the developer to record the plat.
Why it matters
Approval of the final plat means the infrastructure for 35 single-family lots will proceed, including new roads, storm drains, and utility connections. General contractors specializing in residential development and associated trades will be needed for the upcoming construction.
Timing
With the final plat approved, the developer can now record the plat and begin residential street construction and lot sales. Vertical construction for homes will follow, likely within 6-12 months.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: hilliardohio.civicweb.net

Related projects in Hilliard