Final Plat review for Timber Run Development
Up for review Oct 8
Every project links to the city packet it came from.
The Planning Commission will review the final plat for the Timber Run Development, located north of Countryside Drive. This approval is a critical step before new residential construction can begin.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainagePaving / asphaltLandscaping / irrigation
- What happened
- The Planning Commission is scheduled to review the final plat for the Timber Run Development. This indicates the project is nearing readiness for horizontal and vertical construction.
- Why it matters
- Final plat approval will clear the way for site development, including mass grading, utility installation, road construction, and ultimately, home building. This is a significant opportunity for residential GCs and sitework trades.
- Timing
- If approved, site preparation and infrastructure work could commence shortly thereafter. Bids for initial sitework and utility installation typically follow final plat approvals.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: lancasterohio.gov
