Commercial window replacement approved — 190 New St
Approved Aug 18 · confirmed in minutes
Every project links to the city packet it came from.
The Planning Commission approved a zoning permit for the installation of new black windows on the side facade of the Academy Building at 190 New Street, noting the existing windows need replacement.
Commercial glazing / curtain wallResidential windowsHistoric restorationPainting / coatings
- What happened
- The Planning Commission approved a Major Certificate of Appropriateness for the installation of new black windows on the side facade of the Academy Building at 190 New Street.
- Why it matters
- This indicates a window replacement project for a commercial building, requiring contractors specializing in commercial glazing or windows. Given the historic nature of the building, attention to detail and historic preservation may be necessary.
- Timing
- With approval secured, the next step is obtaining building permits. The project could move forward once permits are issued, likely within 1-3 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: lebanonohio.gov
Related projects in Lebanon
- Mixed-use PUD rezoning up for review — I-71 & Bypass 48Feb 10
- Multi-story historic renovation approved — 9 S. BroadwayAug 18
- New Chick-fil-A restaurant site plan approved — 1330 Columbus AveAug 18
- Commercial rezoning approved — 810 N. BroadwayAug 18
- Commercial rezoning approved for storage/towing — Norgal DrAug 18
