Commercial window replacement coming — 17 E. Mulberry St
Up for review Nov 17
Every project links to the city packet it came from.
The property owner seeks a Certificate of Appropriateness to install 5500 Reflections series replacement windows with a tan finish, including awning and picture window configurations divided by a structural post.
Residential windowsFinish / trim carpentryPainting / coatings
- What happened
- A Certificate of Appropriateness application was submitted for window replacements at 17 E. Mulberry Street.
- Why it matters
- Window replacement and associated finish carpentry work will be required once approved.
- Timing
- The design review is scheduled for the November 17, 2026 Planning Commission meeting.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: lebanonohio.gov
Related projects in Lebanon
- Avalon Heights Section 5 final plat up for review — LebanonOct 27
- Lebanon Pressure Improvement Project easements up for review — LebanonOct 27
- Right-of-way dedication and road widening — SR 63 / W. Main StNov 17
- Gas regulator station coming — 3605 Grant DriveNov 17
- New Chase Bank branch coming — Columbus Ave & Genntown DrNov 17
