Drake & Miller Road Roundabout Project — Lebanon
Reviewed Jul 14 · outcome not yet confirmed
Every project links to the city packet it came from.
The City of Lebanon is authorizing a grant application for the Drake and Miller Road roundabout project, which has an estimated cost of $1.7 million and is approximately 60% designed. The City plans to request approximately 49% of the total project cost in grant funding.
Budget: $1.7M
Excavation / gradingPaving / asphaltFlatwork (sidewalks, curbs, driveways)Storm drainageCommercial GCErosion & sediment control
- What happened
- Lebanon City Council authorized a grant application for the Drake Road and Miller Road roundabout project, which has an estimated cost of $1.7 million and is 60% designed.
- Why it matters
- Construction of a roundabout will require significant sitework, paving, and storm drainage work. Contractors should monitor for grant approval and subsequent bidding for this road improvement project.
- Timing
- With design at 60% and a grant application authorized, construction is anticipated for summer 2028, contingent on state grant funds being released in July 2027. Bidding would likely occur in late 2027 or early 2028.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: lebanonohio.gov
