28 new building lots approved — Caravel Sec 4
Approved Jun 15 · confirmed in minutes
Every project links to the city packet it came from.
Final plat approval was granted for Caravel Section 4, featuring 28 new building lots across 20.904 acres in Liberty Township.
Home builder / residential GCExcavation / gradingErosion & sediment controlWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)
- What happened
- The Butler County Planning Commission approved the final plat for Caravel Section 4, encompassing 28 new residential lots on 20.904 acres.
- Why it matters
- The approval enables earthwork, utility installation, and subsequent residential construction phases for the 28 new lots.
- Timing
- Infrastructure development and site preparation are cleared to proceed following final plat approval.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: bcohio.gov
