Parking lot expansion review — 401 Rivers Edge
Reviewed Jul 12 · outcome not yet confirmed
Every project links to the city packet it came from.
An application has been submitted for site plan review to expand the parking lot at the Uplift Medical Cannabis Dispensary located at 401 Rivers Edge.
Excavation / gradingPaving / asphaltStripingErosion & sediment control
- What happened
- The Planning Commission scheduled a site plan review for a parking lot expansion at the Uplift Medical Cannabis Dispensary, though the meeting was ultimately cancelled.
- Why it matters
- Expanding the parking lot will require sitework, grading, and asphalt paving trades.
- Timing
- Since the July 12, 2023 meeting was cancelled, the item is expected to be rescheduled for a future Planning Commission agenda.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: milfordohio.org
Related projects in Milford
- Uplift Medical Cannabis parking expansion coming — MilfordAug 9
- Baker Heating and Cooling garage siding replacement — MilfordAug 9
- Walmart façade remodel and paint update coming — MilfordAug 9
- Chez Renee patio addition up for review — 233 Main StreetAug 9
- Exterior painting and cedar awning design review — 212 MainApr 13
