243-unit residential up for review — Edgehill
Reviewed Jul 20 · outcome not yet confirmed
Every project links to the city packet it came from.
M/I Homes, represented by Joe Looby of EMH&T, received approval for the Edgehill Final Development Plan, a 243-unit residential development comprising attached townhomes and single-family residences, with conditions and granted waivers.
Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingCommercial HVACPainting / coatings
- What happened
- The Edgehill Final Development Plan, a 243-unit residential development, received planning commission approval. This development comprises attached townhomes and single-family residences.
- Why it matters
- This approval signifies the project is moving towards construction, requiring extensive site work, utilities, paving, and landscaping. Framing, roofing, MEP, and interior finishes will be needed for 243 units.
- Timing
- With final development plan approval, the next steps are typically detailed engineering, permitting, and then breaking ground. Project phasing may dictate trade rollout.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
