Bank conditional use under review — Johnstown Rd
Up for review Nov 16
Every project links to the city packet it came from.
Allegro Engineers requests a conditional use approval for three drive-throughs for a Huntington National Bank financial institution on 1.092+/- acres located at the intersection of Johnstown Road and Woodcrest Way.
Commercial GCExcavation / gradingFlatwork (sidewalks, curbs, driveways)
- What happened
- The planning commission scheduled a review for a conditional use permit to construct three drive-through lanes for a new bank branch.
- Why it matters
- Drive-through approvals advance the commercial site layout, leading to sitework, paving, concrete flatwork, and commercial general contracting opportunities.
- Timing
- The item is scheduled for review at the November 16, 2026 planning commission meeting, preceding final site plan approvals and building permit applications.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
