Model home built up for review — Woodhaven subdivision
Reviewed Aug 17 · outcome not yet confirmed
Every project links to the city packet it came from.
Bob Webb c/o Kirk Denyes received conditional use approval for a single model home on Lot 1 of the Woodhaven subdivision, opening the door for its construction.
Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingCommercial HVACPainting / coatings
- What happened
- Conditional use approval was granted for a single model home on Lot 1 of the Woodhaven subdivision.
- Why it matters
- This approval initiates the construction phase for a new single-family residence. Trades required include excavation, concrete, framing, roofing, MEP, painting, and landscaping.
- Timing
- With conditional use approved, building permits are the next step. Construction can commence once permits are issued.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
