New Albany, OH

New home construction setback variance — 6905 Central College Road

Reviewed Aug 24 · outcome not yet confirmed

Every project links to the city packet it came from.

Old World Custom Homes is requesting a variance to allow a portion of a new home, specifically the garage, to encroach approximately 9 feet into the required 50-foot front yard setback. This is due to a recommended right-of-way dedication and other site constraints.

Home builder / residential GCExcavation / gradingFoundations / footingsWater / sewer mainRough framingRoofing
What happened
The Board of Zoning Appeals is reviewing a variance request for a new home at 6905 Central College Road. The variance is needed because a portion of the proposed home would encroach into the front yard setback due to an additional right-of-way dedication and other site constraints, including a floodplain and the need for a septic system.
Why it matters
This indicates a new custom home build is being planned, requiring a general contractor for residential construction, site work contractors for excavation and septic system installation, and potentially other trades involved in new home construction. The need for a septic system also points to specific underground utility work.
Timing
If the variance is approved, the project can proceed to permit application. Construction would likely start after permits are secured, typically within 3-6 months from approval.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: newalbanyohio.org

Related projects in New Albany