Courtyards at Evans Farm Section 2 plat up for review — Orange
Up for review Nov 19
Every project links to the city packet it came from.
Final plat approval for Courtyards at Evans Farm, Section 2 covering 36 lots on 9.209 acres, unlocking site development and residential building packages.
Home builder / residential GCExcavation / gradingErosion & sediment controlWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)
- What happened
- The regional planning commission approved the final subdivision plat for Courtyards at Evans Farm, Section 2, comprising 36 lots on 9.209 acres.
- Why it matters
- Enables sitework contractors and residential builders to initiate grading, utility connection, and subsequent home construction.
- Timing
- Construction activity typically commences upon final plat recording and local permit issuance.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: regionalplanning.co.delaware.oh.us
