Orange Township, OH

Courtyards at Evans Farm Section 2 plat up for review — Orange

Up for review Nov 19

Every project links to the city packet it came from.

Final plat approval for Courtyards at Evans Farm, Section 2 covering 36 lots on 9.209 acres, unlocking site development and residential building packages.

Home builder / residential GCExcavation / gradingErosion & sediment controlWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)
What happened
The regional planning commission approved the final subdivision plat for Courtyards at Evans Farm, Section 2, comprising 36 lots on 9.209 acres.
Why it matters
Enables sitework contractors and residential builders to initiate grading, utility connection, and subsequent home construction.
Timing
Construction activity typically commences upon final plat recording and local permit issuance.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: regionalplanning.co.delaware.oh.us

Related projects in Orange Township