Culvert replacement engineering up for review — Ridgewood Lakes Dr
Up for review Nov 4
Every project links to the city packet it came from.
Ordinance authorizing an agreement with DLZ Ohio, Inc. for engineering and surveying services for the Ridgewood Lakes Drive Culvert Replacement Project at a cost not to exceed $104,910.20.
Budget: $105K
Storm drainageExcavation / gradingStructural / formed concretePaving / asphalt
- What happened
- City Council approved a professional services agreement with DLZ Ohio, Inc. to perform engineering and surveying for the replacement of an aging, structurally compromised culvert near Kerneywood Road and Ridgewood Lakes Drive.
- Why it matters
- Engineering and design precede construction bidding for the structural culvert replacement and roadway repairs.
- Timing
- Engineering design and survey work will take place immediately, leading to a future construction bid package once plans are completed.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: cityofparma-oh.gov
