2-lot subdivision approved — Ringgold Southern
Approved Aug 18 · confirmed in minutes
Every project links to the city packet it came from.
Commissioners approved a plat for the Ringgold Southern Subdivision in Walnut Township, consisting of two lots.
Excavation / gradingHome builder / residential GCPaving / asphaltWater / sewer mainStorm drainageResidential electrical
- What happened
- The Board of Commissioners approved the plat for the Ringgold Southern Subdivision, creating two new residential lots in Walnut Township.
- Why it matters
- This approval means site development and residential construction can proceed on these two lots, requiring sitework, utility installations, and home building.
- Timing
- With plat approval, development plans and building permits are the next steps, typically within 6-12 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: pickawaycountyohio.gov
