Final plat coming — Retreat at Hickory Lakes, Section 1 Part B
Up for review Oct 6
Every project links to the city packet it came from.
Pickerington City Council is reviewing the final plat for The Retreat at Hickory Lakes, Section 1 Part B, which was recommended by the Planning and Zoning Commission. This section is located south of Section 1, Part A of the same development.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageLand clearing / tree serviceFlatwork (sidewalks, curbs, driveways)
- What happened
- The Pickerington Planning and Zoning Commission recommended approval of the final plat for The Retreat at Hickory Lakes, Section 1 Part B, to the City Council. The Council is now reviewing this recommendation.
- Why it matters
- Final plat approval will clear the way for horizontal development of this residential subdivision phase, including mass grading, utility installation (water, sewer, storm, electrical/telecom), and paving of roads. Conditions for approval specify requirements for utility box placement, detention basins, and downspouts.
- Timing
- The final plat recommendation is before City Council for a first reading. Council approval would typically be the next step before site work permits can be issued.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: public.destinyhosted.com
