Pickerington, OH

Final plat review — The Retreat at Hickory Lakes

Reviewed Sep 8 · outcome not yet confirmed

Every project links to the city packet it came from.

The Planning & Zoning Commission is reviewing a final plat for Sections 1 Part B, 2 Part A, and 2 Part B of The Retreat at Hickory Lakes subdivision, located south of Retreat at Hickory Lakes Section 1 Part A. This indicates upcoming residential development.

Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainagePaving / asphaltFlatwork (sidewalks, curbs, driveways)
What happened
The Planning & Zoning Commission is reviewing the final plat for multiple sections of The Retreat at Hickory Lakes subdivision. This is a critical step before new residential construction can begin.
Why it matters
Final plat approval implies civil engineering and site development work, including mass grading, utility installation (water, sewer, storm), and road construction for a new residential community. Home builders will follow for individual homes, needing all residential trades.
Timing
Agenda review is preliminary; if approved, permits for infrastructure and home construction would follow. This typically precedes physical work by several months to a year.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington