Pickerington, OH

Final plat up for review for The Retreat at Hickory Lakes Sec 2 Pt A

Reviewed Sep 9 · outcome not yet confirmed

Every project links to the city packet it came from.

Final plat approval was recommended for The Retreat at Hickory Lakes Section 2 Part A, moving the residential subdivision forward.

Home builder / residential GCExcavation / gradingErosion & sediment controlWater / sewer mainStorm drainageUnderground electrical / telecom
What happened
The Planning and Zoning Commission recommended approval for final plat case FPT 26-03 (Section 2 Part A).
Why it matters
Enables site preparation, utility installations, and grading for this phase of the subdivision.
Timing
The item advances to City Council for final acceptance.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington