Multi-use path/sidewalk — Hill Road, Pickerington
Reviewed Sep 16 · outcome not yet confirmed
Every project links to the city packet it came from.
A 'Multi-use/Sidewalk on Hill Road' is listed under 2026 Major Projects. This indicates construction of a new path for pedestrians and cyclists.
Flatwork (sidewalks, curbs, driveways)Excavation / gradingPaving / asphaltLandscaping / irrigationSignageTraffic control / flagging
- What happened
- The Service Committee agenda identifies a 'Multi-use/Sidewalk on Hill Road' as a major project for 2026.
- Why it matters
- Construction of new multi-use paths and sidewalks requires sitework, concrete flatwork, and potentially minor paving, offering work for these trades.
- Timing
- This is a planned 2026 project. Design and bidding would be initiated prior to construction, likely within the next 6-12 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: public.destinyhosted.com
