Pickerington, OH

Sidewalk installation coming — Long Road

Reviewed Sep 16 · outcome not yet confirmed

Every project links to the city packet it came from.

The City received a $1,000,000 ODOT grant to fill sidewalk gaps along the north side of Long Road and connect to Pickerington Elementary School. Construction is currently scheduled for 2029.

Budget: $1.0M

Flatwork (sidewalks, curbs, driveways)Excavation / gradingLandscaping / irrigationErosion & sediment control
What happened
The City secured a $1,000,000 ODOT grant for a sidewalk project on Long Road.
Why it matters
Grant funding indicates concrete flatwork and associated sitework for sidewalk construction will be needed.
Timing
Construction is slated for 2029, but discussions are ongoing to potentially advance the project by about one year if funding becomes available.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington