Pickerington, OH

Traffic signal upgrades coming — SR 256 and SR 204

Reviewed Sep 15 · outcome not yet confirmed

Every project links to the city packet it came from.

The city plans to work with ODOT as a Local Public Agency (LPA) for signal equipment upgrades along the SR 256 and SR 204 corridors. This resolution is on the consent agenda for approval.

Commercial / industrial electricalUnderground electrical / telecomPaving / asphaltExcavation / gradingTraffic control / flagging
What happened
Pickerington City Council is reviewing a resolution to partner with ODOT for traffic signal upgrades along SR 256 and SR 204 corridors.
Why it matters
Approval will initiate the process for signal equipment upgrades, which will require electrical contractors for installation, underground utilities for new cabling, and potentially paving for restoration. Excavation and traffic control will be necessary during construction.
Timing
This item is scheduled for a consent agenda approval. If approved, design and engineering will follow, with construction likely in 2027 or later, pending ODOT coordination and funding.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington