Plain City, OH

Alder Oaks development up for review — Plain City

Reviewed Sep 2 · outcome not yet confirmed

Every project links to the city packet it came from.

Plain City Council approved the final development plan for the Alder Oaks project, with a contingency for adherence to engineer’s comments, including the addition of four-way stop signs at Fanshell Drive connections.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingCommercial HVACPainting / coatings
What happened
The Plain City Council approved the final development plan for Alder Oaks, based on the Planning and Zoning Commission's recommendation and adherence to engineer's comments regarding road infrastructure.
Why it matters
Final development plan approval means the project is authorized to proceed with detailed engineering and then construction. This is a significant trigger for all trades involved in new residential development.
Timing
Council approval is a green light for the project. Detailed engineering design will follow, after which construction permits can be sought and construction bids issued.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: plaincityohio.gov