Alder Oaks development up for review — Plain City
Reviewed Sep 2 · outcome not yet confirmed
Every project links to the city packet it came from.
Plain City Council approved the final development plan for the Alder Oaks project, with a contingency for adherence to engineer’s comments, including the addition of four-way stop signs at Fanshell Drive connections.
Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingCommercial HVACPainting / coatings
- What happened
- The Plain City Council approved the final development plan for Alder Oaks, based on the Planning and Zoning Commission's recommendation and adherence to engineer's comments regarding road infrastructure.
- Why it matters
- Final development plan approval means the project is authorized to proceed with detailed engineering and then construction. This is a significant trigger for all trades involved in new residential development.
- Timing
- Council approval is a green light for the project. Detailed engineering design will follow, after which construction permits can be sought and construction bids issued.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: plaincityohio.gov
