An area variance was approved for the construction of a new 24x34-foot detached two-car garage, replacing an existing shed. The approval includes conditions for concrete removal and potential landscaping on the west side of the garage, and relocating a man door to the east side.
Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalLandscaping / irrigationDemolitionExcavation / grading
- What happened
- The Liberty Township Board of Zoning Appeals approved an area variance for Mitchell and Jacqueline Trucco to build a new detached two-car garage at their property. The approval was contingent on specific conditions regarding the removal of existing concrete and potential landscaping on one side, and the relocation of a man door.
- Why it matters
- This approval means the project can move forward to permit application. A general contractor will be needed for the new garage construction, including demolition of the existing shed, concrete work for the foundation, new electrical hookups, and potential site work/landscaping to meet the variance conditions.
- Timing
- With variance approved, the next step is typically to finalize construction plans and apply for building permits. This work could begin once permits are secured, likely within 3-6 months.